Do the Little Pieces Matter In the Big Picture?A free technical commentary on the CRD Core Area Sewage Treatment Project
The CALWMC proposes to submit three new concepts for sewage treatment for further detailed analysis to an independent consultant. A technical oversight panel is to ensure engineering, business case, lifecycle costing and other project analysis is properly conducted by the consultant to enable fair apple-to-apple comparisons to be made as the public has clearly requested.
|
Showing posts with label pump station. Show all posts
Showing posts with label pump station. Show all posts
Monday, 7 December 2015
Commentary 1 - Rock Bay Centralized - Pipes and Congested Streets
Labels:
CALWMC
,
centralized
,
Clover Point
,
congestion
,
Cook Street
,
life cycle
,
lifecycle cost
,
operating costs
,
pipes
,
pump station
,
Rock Bay
,
streets
Subscribe to:
Posts
(
Atom
)